18.12.2010, 16:24
Construction
On 10 September 2008 the US Navy signed a $5.1 billion contract with Northrop Grumman Shipbuilding in Newport News, Virginia, to design and construct the carrier. Northrop had begun advance construction of the carrier under a $2.7 billion contract in 2005. The carrier is being constructed at the Northrop Grumman Newport News shipbuilding in Hampton Roads, Virginia, which employs 19,000 workers.[30]
The keel of the new warship was ceremonially laid on November 14, 2009 in Dry Dock 12 (Aprox. at: 36 degrees 59' 32.0" N 76 degrees 26' 41.5" W) by Ford's daughter, Susan Ford Bales. Said Bales in a speech to the assembled shipworkers and DoD officials, "Dad met the staggering challenges of restoring trust in the presidency and healing the nation's wounds after Watergate in the only way he knew how — with complete honesty and integrity. And that is the legacy we remember this morning."[31]
Wie muss man dies verstehen?
Ich komme auf Gesamtkosten (in 2010)von 7,8 mrd US $ nach unserer Zählweise und damit sind noch nicht die Mehrkosten in den nächsten Jahren gedeckt man kann davon ausgehen das die Endkosten bei 10mrd$ liegen und dies wo sparen angsagt wäre in den USA
On 10 September 2008 the US Navy signed a $5.1 billion contract with Northrop Grumman Shipbuilding in Newport News, Virginia, to design and construct the carrier. Northrop had begun advance construction of the carrier under a $2.7 billion contract in 2005. The carrier is being constructed at the Northrop Grumman Newport News shipbuilding in Hampton Roads, Virginia, which employs 19,000 workers.[30]
The keel of the new warship was ceremonially laid on November 14, 2009 in Dry Dock 12 (Aprox. at: 36 degrees 59' 32.0" N 76 degrees 26' 41.5" W) by Ford's daughter, Susan Ford Bales. Said Bales in a speech to the assembled shipworkers and DoD officials, "Dad met the staggering challenges of restoring trust in the presidency and healing the nation's wounds after Watergate in the only way he knew how — with complete honesty and integrity. And that is the legacy we remember this morning."[31]
Wie muss man dies verstehen?
Ich komme auf Gesamtkosten (in 2010)von 7,8 mrd US $ nach unserer Zählweise und damit sind noch nicht die Mehrkosten in den nächsten Jahren gedeckt man kann davon ausgehen das die Endkosten bei 10mrd$ liegen und dies wo sparen angsagt wäre in den USA