Zerstörer
#28
<!-- m --><a class="postlink" href="http://www.indiadefence.com/Talwar.htm">http://www.indiadefence.com/Talwar.htm</a><!-- m --> :
Zitat:The first vessel, the Talwar, commenced engine sea trials in November 2001 and immediately ran into major problems with the machinery, hull, equipment integration and weapons systems. Indian media reports indicate that as of December 2002, the Shtil SAM system had been unable to hit any airborne targets during trial firings. This may be due to integration problems between the combat management and weapons systems. The Indian Navy will not take delivery until all problems are rectified. In fact, the commissioning crew was flown back to India because of the extent of problems, and the time needed to fix them. This has set back scheduled delivery dates very considerably - from May 2002 for the Talwar to sometime around April 2003.
Scheint doch Probleme mit dem System zu geben. Aber mit Sicherheit wird man daran arbeiten...
Zitieren


Nachrichten in diesem Thema

Gehe zu: